Penjadwalan Proyek Dengan Metode Program Evaluation and Review Technique (PERT)

Studi Kasus: Proyek Perumahan Grand Sangatta CV Miftah Collection pada Tahun 2016

  • Nur Annisa Roziya Laboratorium Statistika Ekonomi dan Bisnis FMIPA Universitas Mulawarman
  • Ika Purnamasari Laboratorium Statistika Ekonomi dan Bisnis FMIPA Universitas Mulawarman
  • Wasono Wasono Laboratorium Matematika Komputasi FMIPA Universitas Mulawarman

Abstract

Project scheduling is one of the techniques developed in operations research to solve management problems to obtain optimal solutions. One of the methods used for project scheduling is the method of Program Evaluation and Review Technique (PERT). In PERT method, three time estimates are used, that is optimistic time (a), pessimistic (b), and realistic (m). In this study, PERT method is used to determine the optimal duration and probability value of the completion of the Grand Sangatta housing project on house type 36 which is sourced from CV Miftah Collection. The data obtained are primary data and interview. Based on the results of the analysis, it can be know the activities that are on the critical path are the activities of making the foundation (B), concrete (D), wall (E), roof (H), ceiling (I), and painting (L). The minimum time duration of completion of type 36 homes is 34 days with a 50% confidence level which was originally scheduled for 60 days.

Downloads

Download data is not yet available.
Published
2019-01-22
How to Cite
ROZIYA, Nur Annisa; PURNAMASARI, Ika; WASONO, Wasono. Penjadwalan Proyek Dengan Metode Program Evaluation and Review Technique (PERT). EKSPONENSIAL, [S.l.], v. 9, n. 2, p. 105-110, jan. 2019. ISSN 2798-3455. Available at: <https://jurnal.fmipa.unmul.ac.id/index.php/exponensial/article/view/305>. Date accessed: 04 may 2024. doi: https://doi.org/10.30872/eksponensial.v9i2.305.
Section
Articles